Plumb Perfect PlumbingKnoxville plumbersAnswering 24/7(865) 344-9122
Answered 24/7 in Knoxville, TN

Bathroom remodel plumbing in Knoxville, from rough-in to trim

Moving a toilet or a shower is mostly a question of where the drains and vents can go. We work that out first, then rough it in and set the fixtures once the tile is done.

24/7
Calls answered
Knoxville
Service office
Kitchen & Bath
Service group

Bathroom plumbing remodel work in Knoxville, TN moves or adds drains, vents and supply lines for a new layout, roughs in the shower valve while walls are open, passes the rough-in inspection, and sets the toilet, vanity, faucet and trim after tile and cabinets. The city plumbing permit fee is $55 plus inspection.

Updated October 2026

Bathroom remodels

What Moves Easily and What Doesn't

Supply lines move easily; drains do not. A toilet needs a three-inch drain with fall and a vent, and moving it far can mean cutting joists or a slab. Showers and tubs need a trap below the floor. Sinks are the most flexible. Knowing which fixture is hardest to move shapes the whole layout.

We walk the plan with you or your contractor and check what the floor, crawlspace or slab allows before demolition. For a shower valve alone, see shower repair; for a new tub or shower base, bathtub and shower installation.

Rough-in plumbing for a relocated shower in a Knoxville bathroom
Planning ranges

What Bathroom Remodel Plumbing Costs Depends On

The layout change drives the price more than the fixtures do.

How far fixtures move
Keeping fixtures in place costs least.
Floor type
A crawlspace is simpler than a slab.
New bathroom
New drains, vents and supply lines.
Shower valve
Valve style and body type.
Permit
The city fee is $55 plus inspection.

Moving a Drain

Moving a shower, tub or toilet drain means re-running the pipe under the floor to the stack with enough fall. Over a crawlspace, that is mostly work from below. Over a slab, the concrete is cut and trenched, the new drain laid and inspected, and the slab patched. Joists in the way of a toilet drain may need a different route or a header, which is a carpentry question as much as a plumbing one. We map the route before demolition, so nobody discovers the problem with the floor already open.

Rough-In for a Second Bathroom

Adding a bathroom in a basement, an attic or a converted room starts with where it can drain and vent. Above the main drain, gravity does the work. Below it, as in many basements, the fixtures drain to an ejector basin that pumps up to the main, covered under sewer ejector pumps. The new bathroom also needs hot and cold supply from the main lines, a vent tied into the system or an air admittance valve where allowed, and room for the shower valve.

Slab trenched for a relocated toilet drain

Fixture Relocation

Moving a vanity to another wall, swapping a tub for a walk-in shower, or turning a single sink into a double all change the rough-in. Each fixture has a height and spacing for its drain and supply stub-outs, set by the model you choose, so it helps to pick fixtures before rough-in. Shower valves are roughed in at a height that suits the people using them, with trim ordered to match the valve body. Everything is set to the fixtures' specifications so the trim fits once the tile is done.

Scope

What Our Bathroom Remodel Plumbing Covers

  • Layout review before demolition
  • Drain and vent routes for each fixture
  • Supply stub-outs to fixture specifications
  • Shower valve roughed in at the right height
  • Permit and rough-in inspection
  • Toilet, vanity, faucet and trim set
  • Everything tested for leaks and drainage

Opening Walls in an Older Knoxville Bathroom

A bathroom remodel in an older Knoxville house often opens walls that have not been seen in decades. In homes built before 1986, the copper supply lines may still carry joints made with lead solder, and lead in tap water here comes from plumbing inside the house rather than from the treatment plant. With the walls open anyway, replacing those old runs to the new fixtures costs little, and it means the new bathroom is not tied into old pipe hidden behind fresh tile.
Step by step

From Layout to Finished Bathroom

  1. 1

    Walk the plan

    Layout and fixtures reviewed.

  2. 2

    Permit

    Pulled before rough-in.

  3. 3

    Rough-in

    Drains, vents, supplies and valve set with walls open.

  4. 4

    Inspection

    Rough-in inspected before walls close.

  5. 5

    Trim

    Fixtures set and tested after tile.

How Long the Bathroom Is Out of Service

The bathroom is out of use from demolition until the toilet and fixtures are set, and most of that time belongs to tile, cabinets and inspection rather than plumbing. If it is the only bathroom in the house, we keep the toilet working as long as possible and set it first when the floor is done.

The plumbing visits themselves are short: rough-in early, the inspection, then trim once the tile is grouted. Clear scheduling with your contractor keeps the gaps between them small.

Common questions

Bathroom Plumbing Remodel Questions From Knoxville Homeowners

Can I move my toilet to another wall?

Often, but it depends on the floor, the joists and the path to the stack.

Do I need a permit to remodel a bathroom?

Moving drains, adding fixtures or new lines is permitted work in the city.

Can you add a bathroom in my basement?

Yes, usually with an ejector basin if the fixtures sit below the sewer.

Should I buy fixtures before rough-in?

Yes. Drain and valve positions depend on the fixtures you choose.

Can you work with my contractor?

Yes, most bathroom work is scheduled around the contractor's framing and tile.

Should old pipes be replaced during the remodel?

If they are galvanized, polybutylene or old copper with lead solder, open walls make it the cheapest time.

Kitchen & Bath

Other Kitchen & Bath Jobs We Handle

Garbage Disposal Installation

New disposal in an existing sink and horsepower sizing.

Garbage Disposal Installation in Knoxville

Faucet Installation

Kitchen pull-down faucet and bathroom widespread faucet set.

Faucet Installation details

Faucet Repair

Dripping faucet and faucet cartridge replacement.

Faucet Repair in Knoxville

Bathtub & Shower Installation

Tub to shower conversion and walk-in shower base.

Bathtub & Shower Installation details

Planning a bathroom remodel?

Call before demolition and we'll map the plumbing with you.

Call now (865) 344-9122
Dispatched from Ball Camp Pike

Our Knoxville Service Office

Knoxville, TN
5602 Ball Camp Pike, Knoxville, TN 37921
Call (865) 344-9122